U.S. Architectural Millwork - Knoxville
  • Home
  • About Us
    • Our Team
    • Testimonals
    • News >
      • Blog
    • Careers
  • FAQ
    • Sales
    • Services
    • Shipping, Delivery & Pickup
    • Products
  • Products
    • Mouldings
    • Interior Doors
    • Exterior Doors
    • Hardware
    • Columns
    • Stairs
    • Other Products >
      • Fuller Architectural Panels
      • Synergy Wood
  • Portfolios
    • Shop & Job Site Photos
  • Contact Us
    • Schedule a Consultation
  • Koetter Woodworking
    • envisionIT

It's All Relative: Proper Job Site Conditions

5/24/2018

 
Picture
As temperatures and humidity levels rise, it is more important then ever to ensure all wood products are properly handled in the field, including acclimation, finishing and installation. Architectural millwork, is indeed, much like fine furniture. If the indoor relative humidity is not controlled on the job site there is a chance that the owner will encounter wood movement throughout the life cycle of the project. 

Here are several key factors to take into consideration for the successful installation and finishing of a millwork trim and door package:

  • The job site should be fully enclosed and protected from the elements.
  • HVAC must be up and running with the temperature maintained between 68 – 72 degrees.
  • Relative humidity should be between 30 – 45% (see chart below)
  • Allow products to acclimate for at least  3 – 5 days prior to installation.
  • Make sure all “wet work” has been completed before delivering wood products to the job.
  • Never store material in areas with newly poured concrete, or in rooms that have been recently dry walled or plastered.
  • Surface doors must be properly sealed, including the top and bottom, to prevent warranty against warp & twist from being void.
  • Never start and stop the finishing process. It is crucial that it is completely sealed.
  • Never install a pocket door prior to finishing, The average moisture content of framing material is 15-19%. Once a pocket door is pushed back unfinished, it will absorb the framing moisture causing it to bow and/or warp.
Picture
Additional Resources To Help You Plan Accordingly
​Moisture Meters ​
Humidity Forecast

Comments are closed.

    Author

    The U.S.Architectural Millwork  Blog is written by company thought leaders who have a strong pulse on the industry. They're expressive, skillful, and passionate about their jobs and our customers. Passion causes you to open your mouth when sometimes a whisper will do.

    Archives

    January 2020
    May 2018

    Categories

    All

    RSS Feed

Contact us!
Knoxville, TN 865-524-2161
Asheville, NC 828-280-0464

© U.S. Architectural Millwork 2023
  • Home
  • About Us
    • Our Team
    • Testimonals
    • News >
      • Blog
    • Careers
  • FAQ
    • Sales
    • Services
    • Shipping, Delivery & Pickup
    • Products
  • Products
    • Mouldings
    • Interior Doors
    • Exterior Doors
    • Hardware
    • Columns
    • Stairs
    • Other Products >
      • Fuller Architectural Panels
      • Synergy Wood
  • Portfolios
    • Shop & Job Site Photos
  • Contact Us
    • Schedule a Consultation
  • Koetter Woodworking
    • envisionIT